Commited to exceeding your needs
Research
We have carried out some internal research into one specific job and levels of plasterboard waste, the results of which are in in a report we have created.
This was done with the co-operation of the Main Contractor and the Plasterboard Manufacturer. It indicates that our allowances made of 10% are accurate, but that more can be done to reduce this figure.
